 |
Projects
|

News & Events

14. - 17. 10 2008

20.5.2008
PXA270 SBC with 256MB SDRAM
Voipac DIMM module is now available with
256MB (32bit) SDRAM soldered.
more
1.4. 2008
Microsoft OEM Technical
Seminar
Join the Prague
seminar for the hands-on experience during the technical lab session!
more
21.1.
2008
PXA270 cost-cutting

21.1. 2008
Free Web browser for PXA270
Linux-based Opie
GUI for the PXA270 DIMM Module with free Konqueror browser
is now available.
more
1.11.
2007
Touch TFT display for
PXA270
Hitachi TFT display
with touch screen supported in OS Linux/ Opie and WinCE 6.0
is now available.
more
16. - 19. 10 2007

23.8.
2007
Release of Opie GUI
Graphical user environment OPIE (Open Palmtop Integrated Environment) is
now available
for
the PXA270 DIMM Module
running OS Linux.
more
22.
6. 2007
Release of BSP for WinCE
6.0
Voipac
released a beta version of the BSP for Microsoft Windows Embedded CE 6.0
for the PXA270 DIMM Module.
more
MORE NEWS >>>
|
|

 |
Projects / Development kit |
 |
Development Kit
PXA255
Assignment:
Our task has been to design a development kit,
to be used by the hardware and software developers working with the
PXA255 platform. The kit was supposed to include a base board with
the basic peripheries and interfaces integrated, PXA255 DIMM module,
booth loader, JTAG, OS Linux + related drivers managing the embedded
peripheries.
Solution:
The assigned development team designed and
routed the base board for the module, prepared the necessary
software and peripheral components of the Development kit. Developed
the related documentation, manual and software support for the
developers. The web site, allowing developers that has purchased the
Development kit to download additional information and updates, has
been prepared. The whole project has been managed very successfully
and there have been dozens of satisfied customers who purchased the
development kit during the three-year-period. These days,
there is a whole range of interesting devices and application build
on Voipac DIMM modules and there are still many to come.
Realization time:
2 months

|
|
>>> more about projects in
Company Profile
|